New factory building for Protomould.

By Protomould Plastics
schedule5th Feb 18

We are proud to announce the completion of our newest factory building. Built and situated on the same site as Plas-Tech, the Protomould factory has been significantly expanded and now has its own operating space. 

When we originally acquired Protomould in 2013, the machinery for our East Yorkshire site was situated within the Plas-Tech factory. 


The machinery soon moved to a small converted storage building which has now been significantly outgrown. As a result of positive growth the new building was a necessity to sustain the business. At over 5000sq ft the building will have 7 machines (with plans to grow) and will soon have its own offices incorporated into the building. 

With the increase in floor space, operators are given much more room to access machinery, this provides them with the ability to decrease tool changeovers times and carry out maintenance checks with significant ease and speed. 

The old building, which adjoins the new factory, will now be home for our tooling and machinery centre. This building will house our 2 milling machines for both vacuum forming and injection moulding tools. This is a further area of the business we hope to grow and we now have the space to do so. 

We will keep the news up to date as more machinery arrives and further expansion happen.